Construction of a huge new US Embassy building in Phnom Penh, occupying an entire city block, began in late 2003.

Competition to be involved in such a high profile project was fierce but, as a result of our reputation and proven track record, CPS was appointed as the sub-contractor for the complete design and co-ordination of plumbing and fire systems works, all to comply with stringent American standards.
   
 


Client:


Period of Works:


Project:


Main contractor
:

Main technical contractor:



US Government


Sep 2003 - Sep 2005

Construction of New Embassy in Phnom Penh

Zachary


Comin Khmere

 

 

CPS was employed to design, supply and install the following;
  • Sanitary hubless cast iron system
  • Storm drainage
  • Underground ductile iron water & fire supply system
  • Above ground fire system using Globe sprinklers and Victarlic connections
  • Peerless vertical engine driven fire pumping system
  • Copper hot & cold water reticulation system
  • Sanitary fixtures
  • Waste water treatment plant
  • Pumping systems for ; booster , irrigation , sewage lift station , elevator shaft sump pumps and hot water circulation.

 

 

2005 © Complete Plumbing Services - Web design by Base Bloc Cambodia
 
 
 
 
 
 
 
 
 
Read a case study of this project undertaken by CPS.
 
 
   
   
+855 (0) 23 21 21 41
 
+855 (0) 23 21 21 51
 
   
   
7 Mao Tse Tung Blvd
PO Box 1557
Phnom Penh
Cambodia